  • The space saving solution for storage of hazardous substances near to production, or decentralised, if required for safety or logistical reasons.
  • For the safe storage, dispensing or removal of flammable and water-polluting substances.
  • Install directly next to the external wall of neighbouring buildings or as a fire-rated separate area, e.g. in a production hall. Exception: peroxide stores.
  • Steel spill pallet with removable hot dip galvanised grids (max. load capacity: 1,250 kg/m²).
  • Long-lasting corrosion protection with fully-galvanised base material and high-quality 2K paint (RAL 9002, grey-white).
  • Fire protection panels (A class material, non-combustible) with high insulation properties.
  • Lockable, self closing 1-wing fire-rated EI₂ 90-C door to EN 13501-2, tested in accordance with EN 1634-1, or country-specific design (EI₁ 60 or EI₂ 120) with a door opening angle of 90 ° / 115 °.
  • If required with up to three additional shelves.

Structural analysis

The structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².

Roof drainage

The roof drainage counteracts loads from standing water on the roof. The rainwater is directed via the roof profile to the two short sides of the room and is channeled to an outlet either through the right or left corner profile or through both. From there, it can be directed to a drainage system on site, e.g. via a drainage pipe.

Prerequisites for storing flammable liquids

(Flashpoint ≤ 60 °C, classified as H226, H225 or H224)

  • Create equipotential bonding (earthing) (connection point provided); if required provide lightning protection
  • Country-specific requirements for air exchange rate
  • Specifications in accordance with HSG71
  • Specifications in accordance with ATEX Directive 2014/34/EU
Full description

New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request

New
SALE
bestseller
[[record.name]]
[[record.actionPrice]] [[record.price]] [[record.price]] Excl. VAT
Price on request

Product description

  • The space saving solution for storage of hazardous substances near to production, or decentralised, if required for safety or logistical reasons.
  • For the safe storage, dispensing or removal of flammable and water-polluting substances.
  • Install directly next to the external wall of neighbouring buildings or as a fire-rated separate area, e.g. in a production hall. Exception: peroxide stores.
  • Steel spill pallet with removable hot dip galvanised grids (max. load capacity: 1,250 kg/m²).
  • Long-lasting corrosion protection with fully-galvanised base material and high-quality 2K paint (RAL 9002, grey-white).
  • Fire protection panels (A class material, non-combustible) with high insulation properties.
  • Lockable, self closing 1-wing fire-rated EI₂ 90-C door to EN 13501-2, tested in accordance with EN 1634-1, or country-specific design (EI₁ 60 or EI₂ 120) with a door opening angle of 90 ° / 115 °.
  • If required with up to three additional shelves.

Structural analysis

The structural calculations for the technical room system are based on Eurocode 3 (EN 1993). The loads on the structure are measured according to Eurocode 1 (EN 1991-1-3) for a characteristic wind load qk,w = 0.585 kN/m² and a ground snow load sk = 2.5 kN/m². The structure is also designed for earthquake zone 3 according to EN 4149, EN 1998-1:2004. With additional equipment up to wind load zone 4 with terrain category I (qk,w = 1.064 kN/m²) or up to ground snow load sk = 5.86 kN/m².

Roof drainage

The roof drainage counteracts loads from standing water on the roof. The rainwater is directed via the roof profile to the two short sides of the room and is channeled to an outlet either through the right or left corner profile or through both. From there, it can be directed to a drainage system on site, e.g. via a drainage pipe.

Prerequisites for storing flammable liquids

(Flashpoint ≤ 60 °C, classified as H226, H225 or H224)

  • Create equipotential bonding (earthing) (connection point provided); if required provide lightning protection
  • Country-specific requirements for air exchange rate
  • Specifications in accordance with HSG71
  • Specifications in accordance with ATEX Directive 2014/34/EU

Technical data

Model RFP 115-2
Clear bay depth [mm] 1.560
Dimensions (without equipment) W x D x H [mm] 1976 x 1784 x 2629
Bay dimensions W x D x H [mm] 1538 x 1.560 x 2333
Door version hinged door
Door design 1-wing
Fire resistance F90/rei90
Rei 120
Load capacity [kg/m²] 1250
Sump capacity [l] 349
Colour Grey white
RAL Code 9002
Capacity IBC / CP / EP / drum 0 / 1 / 1 / 4
Weight [kg] 1075

Documents

Do you need help?
We work hard to give you good advice.
Free Expert Advice +44 1952 811 991

Mon - Thu: 08:30 - 17:00 Fri: 08:30 - 16:00

Menu
Log in
Added to basket
Go to basket
We would be pleased to provide you with advice!

Give us a call or fill out the form and we will get back to you as soon as possible.

Mon - Thu: 08:30 - 17:00 | Fri: 08:30 - 16:00
i

Calls are handled by our UK team. All sales are processed via our German parent company so are VAT* / tariff free where applicable. *Must be fully IE VAT registered

Use code DEN10 at checkout for 10% off ALL of our catalogue products. Cannot be combined with other promotions, discounts or other special prices. Does not apply to open quotations. IMPORTANT: our warehouse will close on the 17th of December, with the last date for dispatch being the 16th. It will reopen on the 2nd of January 2025.